Public consultation:
amendments of the interconnection agreements
Brandov

In accordance with Article 4 (2) of the Commission Regulation (EU) 2015/703 of 30 April 2015 establishing Network Code on Interoperability and Data Exchange Rules (NC INT), Lubmin-Brandov Gastransport GmbH launches a public consultation on:

Amendment No. 6 to Grid Connection Agreement for the Grid Connection Point Brandov

The subject of these contractual changes is to set procedures for management of cross-border Natural Gas transmission operations (incl. nominations and matching) and communication in exceptional events in line with Article 10 of NC INT.

Network Users are invited to comment on the attached contractual provisions concerning the nomination and matching process, the allocation of gas quantities and the communication procedure in case of exceptional events and send their comments to info@lbtg.de  until 26 April 2019.

REGULATION (EC) No 715/2009 (Annex 1, chapter 3)

According to REGULATION (EC) No 715/2009 (Annex 1, chapter 3) European Transmission System Operators are obliged to publish several information. In the following we provide an overview, where you can find the information in detail.

Information on the next tariff period and before the yearly auction (publication requirements according to Art. 29 and 30 of the Commission Regulation (EU) 2017/460 of the European Commission)

Simplified tariff model (publication requirements according to Art. 30 of the Commission Regulation (EU) 2017/460 of the European Commission)

 

3.1.2 a) A detailed description of the offered services and tariffs
Documents for access

3.1.2 b) and c) 1. (Transportation-) contracts and other relevant documents
Documents for access

3.1.2 c) Network code / standard conditions
Documents for access

3.1.2 c) 2. Gas quality parameters
Documents for access

3.1.2 c) 3. Pressure requirements
[...]

3.1.2 c) 4. Procedure in the event of interruption of interruptible capacity
Documents for access

3.1.2 d) Harmonised procedures applied when using the transmission system, including the definition of key terms
GasNZV
Cooperation Agreement

3.1.2 e) Provisions on capacity allocation, congestion management, anti-hoarding and reutilization procedures
GasNZV
Documents for access

3.1.2 f) Rules applicable for capacity trade on the secondary market vis-à-vis the transmission system operator
Documents for access
Cooperation Agreement

3.1.2 i) Detailed description of the gas system incl. names of the operators of interconnected systems / facilities
Pipelineinformation

3.1.2 j) Rules applicable for connection
Information to grid connection

3.1.2 k) Information on emergency mechanisms
GasNZV

Documents for access

3.1.2 l) Procedures agreed at interconnection points (if relevant), procedures on nomination and matching, other procedures in relation to allocation and quantity deviation, incl. the methods used.

Information on capacities are available here.

Information on physical flows on the whole OPAL will be published OPAL Gastransport GmbH in its capacity as technical operator and are available here  (Physical flows, gross calorific values)

3.3. (1) a)–e), (4), (5) Capacities, nominations and renominations, actual flows, calorific values
Grid data

3.3. (1) f) u. g) Interruptions
Interruptions / Maintenance

3.4 (1) and (2) Information on secondary trading
[...]